HYDROPOWER INSTALLATIONS
Please find details of Easton Renewable Energy’s current portfolio of hydropower sites below.
(Please note: photos are for illustration purposes only and may not be actual images of respective sites.)

KLD999
Site: KLD999
Asset type: Hydropower (Run-of-river)
Model: 999kW Gilkes horizontal axis twin jet turgo type turbine
Target annual output: 3,500,496kWh
Location: Scotland
Subsidy type: Feed-in-Tariffs
Status: Awaiting Grid Connection